All Property List

IDR
IDR
For sale land, 200 Sqm
Sold

For sale land, 200 Sqm

For sale land, 200 Sqm
ID L005-0386 | Land

Kayu Tulang, Canggu

Land for sale Surface Land: 2 are (200 sqm), with an existing building (a garment, with IMB) Location: Kayu Tulang - Canggu Total price: IDR 2,600,000,000

TBA

See Detail
Villa Nirjara 2
Sold
Ready in March

Villa Nirjara 2

Villa Nirjara 2
ID V005-4416 | Villa

Tibubeneng, Canggu

A stunning 3-bedroom, 2-story villa situated in the desirable residential area of Tibubeneng is currently available for sale. The construction of this property has already commenced and is expected to be fully completed by March. This villa is being sold unfurnished with the option to be fully furnished at an additional cost of USD 20,000. The property is situated on a 250 sqm land allotment an

TBA

3 Bedroom(s)
3 Bathroom(s)
Yes
Unfurnished
Close
250 m2
See Detail
Villa Nirjara 1
Sold
Ready in March

Villa Nirjara 1

Villa Nirjara 1
ID V005-4415 | Villa

Tibubeneng, Canggu

Can be leased until 10 September 2044 

A stunning 3-bedroom, 2-story villa situated in the desirable residential area of Tibubeneng is currently available for sale. The construction of this property has already commenced and is expected to be fully completed by March. This villa is being sold unfurnished with the option to be fully furnished at an additional cost of USD 20,000. The property is situated on a 250 sqm land allotment an

TBA

3 Bedroom(s)
3 Bathroom(s)
Yes
Unfurnished
Close
250 m2
See Detail
Eco Stay Villa
Sold
Ready July'23

Eco Stay Villa

Eco Stay Villa
ID V005-4406 | Villa

Tibubeneng, Canggu

Introducing this beautiful off-plan 3-bedroom villa, located in a comfortable residential area in Tibubeneng and built on 85 sqm land, now available for sale. Comprising of 3 bedrooms, 3 bathrooms, a closed living and dining area, an equipped kitchen, a private swimming pool, and private parking. This villa offers an excellent opportunity for anyone seeking to invest in a long-term living property

TBA

3 Bedroom(s)
3 Bathroom(s)
Yes
Fully Furnished
Close
83 m2
See Detail
The Rooftop Villa
Sold
Ready Nov or Dec'23

The Rooftop Villa

The Rooftop Villa
ID V005-4405 | Villa

Padang Linjong, Canggu

We are pleased to present an off-plan 3-bedroom, off-plan 3-bedroom, 2-story villa in the highly coveted location of Canggu, now available for yearly rental and sale. This villa boasts a land size of 200 sqm, featuring 3 beautifully appointed bedrooms, 3 modern bathrooms, a guest toilet, a fully equipped kitchen, an open-plan living and dining area, a balcony, a private swimming pool, a rooftop te

3 Bedroom(s)
3 Bathroom(s)
Yes
Fully Furnished
Open
200 m2
See Detail
Land for rent, 340 Sqm
Sold

Land for rent, 340 Sqm

Land for rent, 340 Sqm
ID L005-0382 | Land

Batu Bolong, Canggu

Land for sale minimum 25 years Surface Land: 3,4 are (340 sqm) Price per are: IDR 40,500,000 Location: Batu Bolong - Canggu Total price: 3,442,500,000

TBA

See Detail
Land 3,75 are, For rent
Sold

Land 3,75 are, For rent

Land 3,75 are, For rent
ID L005-0381 | Land

Kayu Tulang, Canggu

Land for sale minimum 25 years Surface Land: 3,75 are (375 sqm) Price per are: IDR 25,000,000 Location: Kayu Tulang - Canggu Total price: IDR 2,343,750,000

TBA

See Detail
Sky Way Residence C
Sold
Off Plan

Sky Way Residence C

Sky Way Residence C
ID V005-4401 | Villa

Berawa, Canggu

Can be leased until 30 April 2057 

Presenting a 2-bedroom off-plan penthouse apartment located in the desirable location of Berawa, characterized by a total land area of 750 square meters and a building size ranging from 137 to 160 sqm. The building encompasses 3 levels, comprising 23 units in total, with the 3rd/4th floors featuring 8 two-bedroom units. Each unit boasts a range of amenities, including 2 bedrooms, 2 bathrooms, a

TBA

2 Bedroom(s)
2 Bathroom(s)
Yes
Fully Furnished
Close
-
See Detail
Sky Way Residence B
Sold
Off Plan

Sky Way Residence B

Sky Way Residence B
ID V005-4400 | Villa

Berawa, Canggu

Can be leased until 30 April 2057 

Presenting a 1-bedroom off-plan apartment located in the desirable location of Berawa, characterized by a total land area of 750 square meters and a building size ranging from 65 to 79 sqm. The building encompasses 3 levels, comprising 23 units in total, with the 2nd floor featuring 8 one-bedroom units. Each unit boasts a range of amenities, including a bedroom, a bathroom, a wardrobe, a kitche

TBA

1 Bedroom(s)
1 Bathroom(s)
Yes
Semi Furnished
Close
-
See Detail
Sky Way Residence A
Sold
Off Plan

Sky Way Residence A

Sky Way Residence A
ID V005-4399 | Villa

Berawa, Canggu

Presenting a 1-bedroom off-plan apartment located in the desirable location of Berawa, characterized by a total land area of 750 square meters and a building size ranging from 85 to 102 square meters. The building encompasses 3 levels, comprising 23 units in total, with the 1st floor featuring 7 one-bedroom units. Each unit boasts a range of amenities, including a bedroom, a bathroom, a wardrob

TBA

1 Bedroom(s)
1 Bathroom(s)
Yes
Semi Furnished
Close
-
See Detail
24 Are land, For lease
Sold

24 Are land, For lease

24 Are land, For lease
ID L005-0378 | Land

Tumbak Bayuh, Canggu

Land for sale (24 years, lease until 1 November 2047) Surface Land: 24 are (2400 sqm) Price per are: IDR 12,000,000 Location: Canggu - Tumbak Bayuh Total price: IDR 6,912,000,000

TBA

See Detail
Belleza Villa Bali B
Sold
Off Plan

Belleza Villa Bali B

Belleza Villa Bali B
ID V005-4384 | Villa

Tumbak Bayuh, Canggu

Discover luxury living in this off-plan 2-bedroom, one-story villa located in a prime location. Construction has already begun and is projected to be completed in 7 months or by August. Offering approximately 98,9 sqm of living space within a 150 sqm parcel. With 2 en-suite bedrooms, a well-appointed kitchen, and an open-plan closed living and dining area, this villa is designed for comfort and

TBA

2 Bedroom(s)
2 Bathroom(s)
Yes
Semi Furnished
Close
150 m2
See Detail
All transactions on this Website are in IDR only. Other currencies are for reference.
Contact us for exact conversion rates.